
Steelwork and welding on board
Parts are fitted in position and welded on the ship itself, from scaffolding or from the deck.
- Supports for glass windscreens
- Window posts
- External stairs and railings
- MIG/MAG welding, welds ground clean
We work as subcontractors on board ships under construction. We take on work on the open decks: supports for glass windscreens, stairs, railings. Where required, we install the glass as well.
Write to us

Parts are fitted in position and welded on the ship itself, from scaffolding or from the deck.

We work for shipyards, main contractors and ship outfitting companies. We take on a portion of the work and carry it out with our own team.
A deck area or a type of structure. We work to the drawings supplied.
The welders and fitters come with their own foreman.
The welds stay visible after painting, so we grind them clean.
The panels are lifted by the yard crane on a vacuum lifter and set in place by hand. At height we work in harnesses, clipped to a lifeline.
Our foreman answers for our portion of the work until it is handed over.

The raked supports were fitted and welded on board, then we installed the glass panels between them.

The glass panels were lowered one at a time into the bays of the steel grid. The team worked on the beams.

The stringers and posts were welded on board.
Photos taken by our team during work on board.
Solanord is a company of welders and fitters working on board cruise ships under construction.
MIG/MAG.
Our foreman, for the duration of the work.
Both, with the same team. We can also take on the structure alone.
Access to the work area. For glass installation, the yard crane as well.
Tell us what work you have, in which area of the ship, and whether there are drawings.